Your risk in 60 seconds
Think of your fastest-moving item. Three numbers — same arithmetic as the dashboard below, computed on your device.
Days of cover
How long current stock lasts vs. how fast it can be replenished. Every number is verifiable arithmetic — no black box. Use the what-if bar to simulate a disruption.
All items
8 tracked · sorted by risk exposure
What-if: delay
Scenarios
| Risk exposure | Item | On hand | Monthly usage | Days of cover | Lead time | Primary supplier | Supplier dependency |
|---|---|---|---|---|---|---|---|
| Critical | 8 kW hybrid inverter Mission-criticalINV-HYB-8K | 1,600 | 1,200 | 40 d | 90 d | Jiangsu SunCore Inverters | Single-sourced |
| |||||||
Suggested: order 4,400 piece (≈ 1,848,000 USD) — order nowDraft RFQ email → | |||||||
| Critical | 10 kWh LFP battery module Mission-criticalBAT-LFP-10K | 1,800 | 900 | 60 d | 75 d | Guangzhou PowerCell | Single-sourced |
| |||||||
Suggested: order 1,980 piece (≈ 1,207,800 USD) — order nowDraft RFQ email → | |||||||
| At risk | 6-string combiner box COMBINER-6 | 2,500 | 1,500 | 50 d | 45 d | Dongguan Combiner Mfg | Single-sourced |
| |||||||
Suggested: order 1,950 piece (≈ 105,300 USD) — order nowDraft RFQ email → | |||||||
| At risk | Power optimizer Mission-criticalOPT-PWR-01 | 6,800 | 3,000 | 68 d | 60 d | Penang Optimizer Tech | Single-sourced |
| |||||||
Suggested: order 3,600 piece (≈ 136,800 USD) — order nowDraft RFQ email → | |||||||
| Watch | Mounting rail 4m MNT-RAIL-4M | 15,000 | 6,000 | 75 d | 55 d | Bac Ninh Mounting Systems | Single-sourced |
| |||||||
| Secure | DC solar cable 6mm² CBL-DC-6MM | 30,000 | 30,000 | 30 d | 10 d | Hamburg Cable & Connectors | Single-sourced |
| Secure | MC4 connector pair CON-MC4 | 80,000 | 60,000 | 40 d | 14 d | Shenzhen Connect Co. | 2 suppliers |
| Secure | 450W mono PV module Mission-criticalMOD-450-MONO | 36,000 | 9,000 | 120 d | 75 d | Hefei Solar Modules | 2 suppliers |